Program view

Operator view

Monitoring screen(owner view)

About PMS HIL test

  • Support User friendly Contents
  • Consist of “Operator View” and “Monitoring Screen”, each program is for tester and owner respectively
  • We calculate dynamic equation(not sequence test)
  • Communicate with PMS every 0.1 sec
  • We contain protection scheme(over current, over frequency, under frequency, over voltage, under voltage, over excitation, under excitation and so on)

Test scope

Functional test

  • PMS functions in alarms
  • Signal fail
  • Generator breaker connection, disconnection, interlock
  • Generator engine control
  • Generator standby selection
  • Load dependent standby start&stop
  • Load sharing(symmetric, asymmetric, fixed, manual load sharing mode)
  • Net frequency control
  • Start blocking of heavy consumers
  • Bustie synchronizing
  • Main transformer breakers, 440V SWBD breakers, drilling distribution breakers, emergency breaker, 220V breakers test
  • Consumer load control
  • Blackout prevention (drilling, k-chief)
  • Blackout detection, restart
  • Power limit of drilling package, drawworks, drilling plant, )

Failure test

  • Short circuit(3 phase fault)
  • Load trip
  • Generator trip
  • AVR, GOV control fail
  • Over current test
  • Switchboards tie breakers trip

PMS HIL Test Simulator configuration

  • Development Tool : ECLIPS
  • Development environment : JDK 7.0
      - Programming Language : JAVA
  • Program Overview
    • 1. Develop features that communicate with analysis engine
    • 2. Develop Graphic Builder
        - drawing, create various event etc.
    • 3. Develop Real time interface
        - Interface which communicate with PMS every 0.1 sec
    • 4. Develop Virtual PMS
        - Create event for performing HIL